Under-House Excavation in Auckland

Digging out beneath an existing house for a garage, storage, a workshop or a full lower floor, while the house stays standing above.

  • Micro diggers, conveyors and tracked barrows
  • House propped to an engineer's design
  • New footings, drainage and slab base prepared

Get a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Thousands of Auckland villas and bungalows sit on timber piles on a slope, with a tall, dirt-floored space underneath at the downhill end. Digging that space out gives a garage, a laundry, storage or a whole extra floor without changing the roofline.

It is slow, careful work. The house has to be held up while the ground that supports its piles is taken away, and every cubic metre comes out through a gap not much bigger than a doorway.

Completed lower level under a house
Illustrative photo

How it is done

  1. Design. An engineer designs the temporary propping, the new foundations and any retaining wall at the uphill end. The council consents it.
  2. Propping. Steel beams and props carry the floor while old piles are removed in stages.
  3. Digging. A micro digger of around one tonne works under the bearers. Spoil goes out by conveyor or tracked barrow to a truck or skip at the kerb.
  4. Retaining and footings. The uphill cut is retained, new footings or a slab edge are poured, and permanent posts or walls take the load.
  5. Drainage and slab base. Subsoil drains, a damp-proof membrane and compacted hardfill go in before the slab.

What decides whether it is worth doing

  • Head height. The more soil that has to come out to reach a legal ceiling height, the more it costs.
  • Ground. Clay digs cleanly. Basalt under a Mount Eden or Epsom villa means rock breaking in a confined space.
  • Getting spoil out. A house on a narrow site with no side access adds handling to every load.
  • Water. A dug-out subfloor at the bottom of a slope collects water unless it is drained properly.
  • Character overlays. In special character areas, changes visible from the street can need a resource consent.
  • The neighbours. Houses in the villa suburbs are close together. A cut near the boundary has to be supported so next door's ground does not move, and a condition survey before work starts protects everyone.

Related work

If the floors are already out of level, relevelling is done while the house is propped. If you are building new, a basement cut on an open site is far cheaper per cubic metre. Sites with no machine access at all are covered under tight access excavation.

Under-house excavation prices

ItemGuide price
Under-house digging and spoil removal$300 to $700 per m³
Typical under-house digout, excavation only$25,000 to $90,000
Engineer's design$1,500 to $4,000
Building consent fees$2,500 to $6,000

Guide prices for excavation only. Propping, foundations, retaining, drainage and the slab are separate.

Questions about under-house excavation

How much does under-house excavation cost in Auckland?

As a guide, $300 to $700 per cubic metre for the digging and spoil removal, which puts the excavation on most jobs at $25,000 to $90,000. Propping, new foundations, retaining and the slab are on top.

Do I need a building consent to dig out under my house?

Yes. Removing ground that supports the piles and adding new foundations is structural building work, so it needs a consent and an engineer's design. Confirm with Auckland Council.

Can we live in the house while it is done?

Often, yes, though it is noisy and services may be off at times. The engineer and contractor will say if any stage needs the house empty.

How long does it take?

The excavation is usually two to six weeks, depending on volume and access. The whole project, with consent, foundations and fit-out, runs to several months.

Who actually does the work?

An independent Auckland earthworks contractor that we partner with. They come to the site, price the job in writing and carry it out under their own name.

How it works

From enquiry to finished job.

  1. Tell us about the job

    Send the form or call. What needs digging, a rough size and a suburb is enough to start.

  2. Site visit

    The contractor checks access, slope, the ground, underground services and where the spoil can go.

  3. Written, itemised quote

    Machine time, cartage, tip fees, imported metal and any consent costs listed separately, with a start date. No obligation.

  4. Dig, cart and tidy up

    Sediment controls go in first. The site is left trimmed, compacted and clean, and you walk it before the last invoice.

Get a price on under-house excavation

Send the form and we will line up a free site visit. You then get a written quote with every cost listed. Or ring and talk it through.

Call 09 886 7219

Request a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Call nowFree quote