Home › Services › Excavation

Excavation in Auckland

Bulk and detailed excavation for houses, driveways, pools, drains and landscaping. The quote shows where the money goes: machine hours, truck loads, tip fees and imported metal.

  • Diggers from 1 tonne to 20 tonne, matched to the access
  • Quotes that list cartage and tip fees separately
  • Service plans checked before the bucket goes in

Get a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Excavation is the digging part of earthworks: taking ground out to a set line and level. Bulk excavation removes volume quickly for a basement, a building platform or a driveway. Detailed excavation is the careful work that follows, such as footings, drain trenches and trimming a pad to within a few millimetres.

Most of what makes one excavation quote dearer than another is not the digging. It is the size of machine that can reach the work, how far the trucks have to cart the spoil, and what the tip charges for it.

Digger bucket lifting a load of soil
Illustrative photo

How an excavation quote is built

  1. Volume. Length by width by depth gives cubic metres in the ground. Dug clay swells by 20 to 40 percent, so 10 m³ in the ground is 12 to 14 m³ on the truck.
  2. Machine. A 1.7 tonne digger fits down a side path but moves a fraction of what a 13 tonne machine does. The excavator output guide gives realistic daily figures.
  3. Cartage. Truck hours to the tip and back, plus the tip fee per load.
  4. Ground. Basalt needs a rock breaker. Wet clay and peat slow everything down.
  5. Making good. Hardfill, compaction, topsoil and sediment controls.

The earthworks pricing guide has worked examples.

Hourly rate or fixed price?

Small, clear jobs are often done on hourly rates: a day of trenching, clearing a bank, loading out a pile of soil. A fixed price suits a job with drawings and a defined volume. Where the ground is unknown, a fixed price with stated allowances for rock and for unsuitable soil is fair to both sides. Ask for the allowance rates in writing, so you know what an extra truckload or an hour of rock breaking will cost before it happens.

If you only need a machine and a person to drive it, see digger hire with an operator.

Before the digging starts

  • Service plans are requested through beforeUdig and the lines are located on site.
  • Work near public stormwater or wastewater pipes is cleared with Auckland Council or Watercare first.
  • Silt fences and a stabilised entrance go in before topsoil is stripped.
  • Cuts deeper than 1.5 metres are battered back, benched or shored, and cuts close to a boundary or building are checked by an engineer.

Excavation prices in Auckland

ItemGuide price
Dig and load, good access$25 to $60 per m³
Cart away and tip clean fill$45 to $110 per m³
Dig and remove, tight access$120 to $300 per m³
3 to 5 tonne digger with operator$110 to $150 per hour
8 to 14 tonne digger with operator$140 to $190 per hour
Machine transport to site and back$300 to $800

Guide prices before GST on a site with reasonable access. The written quote that follows a site visit is the price that counts.

Questions about excavation

How much does excavation cost per cubic metre in Auckland?

As a guide, $25 to $60 per cubic metre to dig and load with good access, plus $45 to $110 to cart the spoil away and tip it. On a tight-access site, digging and removal together run $120 to $300 per cubic metre.

How long does an excavation take?

A mid-sized digger with trucks running can shift 100 to 200 cubic metres on a good day. A mini digger in a back yard may manage 10 to 25. Rain, rock and waiting on trucks all cut the output.

What about pipes and cables in the ground?

A beforeUdig request is lodged for the plans of power, gas, water and fibre before any digging. The marked services are then located on site and exposed carefully, because plans are often out by a metre or more.

Does it need a resource consent?

It depends on the volume and area of earth moved, the slope, the zone and any overlays on the property, such as a flood plain, an overland flow path or protected trees. Many small residential jobs are permitted without one. Check the property on Auckland Council GeoMaps and confirm with the council before work starts.

Who actually does the work?

An independent Auckland earthworks contractor that we partner with. They come to the site, price the job in writing and carry it out under their own name.

How it works

From enquiry to finished job.

  1. Tell us about the job

    Send the form or call. What needs digging, a rough size and a suburb is enough to start.

  2. Site visit

    The contractor checks access, slope, the ground, underground services and where the spoil can go.

  3. Written, itemised quote

    Machine time, cartage, tip fees, imported metal and any consent costs listed separately, with a start date. No obligation.

  4. Dig, cart and tidy up

    Sediment controls go in first. The site is left trimmed, compacted and clean, and you walk it before the last invoice.

Get a price on excavation

Send the form and we will line up a free site visit. You then get a written quote with every cost listed. Or ring and talk it through.

Call 09 886 7219

Request a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Call nowFree quote