Retaining Walls in Auckland
When a cut needs holding, the digging and the wall are one job. Timber pole, concrete, Keystone-style block, gabion and rock walls, each with the drainage that keeps it standing.
- The cut, the wall and the backfill from one contractor
- Timber, concrete, block, gabion and rock walls
- Engineer and building consent arranged over 1.5 m
Get a free quote
Tell us about the job. We reply within one working day.
Nearly every retaining wall starts as an earthworks job. A bank is cut to make room for a driveway, a lawn or a house, and the cut face has to be held. Having the same contractor do the dig and the wall avoids the usual gap between trades, where a cut sits open through a wet month waiting for a wall builder.
The wall type follows from the site: how high the cut is, what sits above it, how much room there is behind it and whether a drilling rig or only a mini digger can reach it.

Wall types and where each fits
- Timber pole and rail. The usual choice up to about 2 metres. Poles are drilled and concreted, rails go behind. Lowest cost and fast. The timber wall guide covers treatment and post depth.
- Concrete sleepers or masonry block. For driveways, boundaries and walls close to a house, where a long life matters.
- Keystone-style block. Dry-stacked blocks on a compacted base, tied back with geogrid when taller. See the Keystone wall guide.
- Gabion baskets. Rock-filled wire baskets that drain freely. See gabion walls.
- Rock walls. Large basalt boulders placed by digger, common on rural and large suburban sites.
- Fibreglass and other sheet systems. Glass-reinforced plastic sheet piles are used for stream banks, seawalls and waterlogged ground where timber would rot and steel would rust. They are a specialist product, designed by an engineer, and rarely the right answer for an ordinary garden wall.
What the earthworks side adds
A wall is only as good as what is behind and under it. The cut is taken back far enough to fit a drain coil and at least 300 mm of free-draining metal behind the wall, with filter cloth against the soil. The base is dug to firm ground. Backfill goes in layers, and the spoil that does not go back is trucked away. Skipping any of that to save a day is how walls end up leaning. The subsoil drainage guide explains the drain behind the wall.
When a consent is needed
A retaining wall needs no building consent when it holds back no more than 1.5 metres of ground and carries no extra load. A driveway, a building, a pool or a steep bank above the wall counts as extra load, and then even a low wall needs an engineer's design and a consent. Where someone could fall a metre or more, a fence or barrier goes on top. The earthworks themselves can also need a resource consent on some sites. Confirm both with Auckland Council for your property.
Retaining wall prices in Auckland
| Item | Guide price |
|---|---|
| Timber wall up to 1.5 m | $350 to $600 per m² |
| Engineered timber wall over 1.5 m | $600 to $950 per m² |
| Concrete sleeper or masonry block wall | $550 to $950 per m² |
| Keystone-style block wall | $500 to $850 per m² |
| Gabion basket wall | $400 to $750 per m² |
| Rock wall placed by digger | $350 to $700 per m² |
| Engineer's design, where needed | $1,500 to $4,000 |
Guide prices per square metre of wall face, built and drained. The cut and cartage of spoil are priced with the earthworks.
Questions about retaining walls
What does a retaining wall cost when it is built with the earthworks?
As a guide, $350 to $600 per square metre of wall face for timber up to 1.5 metres, $550 to $950 for concrete sleeper or block and $400 to $750 for gabions, built and drained. A wall 12 metres long and 1.2 metres high is 14.4 square metres. The full breakdown is in the retaining wall cost guide.
Does a retaining wall need a building consent?
Not if it retains no more than 1.5 metres of ground and carries no extra load such as a driveway or building. Above that height, or with a load on top, it needs both a consent and an engineered design. Auckland Council can confirm what applies to your site.
Can the wall go in at the same time as the digout?
Yes, and it should. The cut is supported sooner, the drainage goes in while the trench is open, and the spoil is used as backfill instead of being carted away and bought back.
Are fibreglass retaining walls used in Auckland?
Occasionally, as sheet piling along streams, ponds and the coast. For house sites, timber, concrete and block walls are easier to build and to get consented.
Who actually does the work?
An independent Auckland earthworks contractor that we partner with. They come to the site, price the job in writing and carry it out under their own name.
From enquiry to finished job.
Tell us about the job
Send the form or call. What needs digging, a rough size and a suburb is enough to start.
Site visit
The contractor checks access, slope, the ground, underground services and where the spoil can go.
Written, itemised quote
Machine time, cartage, tip fees, imported metal and any consent costs listed separately, with a start date. No obligation.
Dig, cart and tidy up
Sediment controls go in first. The site is left trimmed, compacted and clean, and you walk it before the last invoice.