In short
- A 3 to 5 tonne digger with an operator is $110 to $150 an hour, and a tip truck $110 to $150.
- Digging costs $25 to $60 per m³. Carting it away and tipping it adds $45 to $110.
- Soil swells 20 to 40 percent when dug, so trucks carry more than the hole measures.
- Access, cartage distance and ground conditions move the price more than volume does.
Earthworks in Auckland are priced three ways: by the hour for machine and operator, by the cubic metre for bulk digging and cartage, or as a fixed price for a defined job. As a guide, a mid-size digger with an operator is $110 to $150 an hour, digging and loading is $25 to $60 per cubic metre, and carting spoil away adds $45 to $110 per cubic metre.
Hourly rates
| Machine with operator | Guide rate per hour | Typical use |
|---|---|---|
| 1.7 tonne mini digger | $95 to $130 | Trenches, back yards, small digouts |
| 3 to 5 tonne digger | $110 to $150 | Driveways, footings, drainage |
| 8 to 14 tonne digger | $140 to $190 | House sites, pools, loading trucks |
| 20 tonne digger | $170 to $240 | Bulk earthworks |
| 6-wheel tip truck | $110 to $150 | Carting spoil and metal |
| Bobcat or skid steer | $100 to $140 | Spreading and tidying |
| Digger with rock breaker | $180 to $280 | Basalt and concrete |
Guide prices for Auckland before GST, on a site with reasonable access. Only the written quote that follows a site visit is a firm figure.
Hourly work usually has a minimum of three or four hours and a transport charge of $300 to $800 to get the machine to site and home again. A small digger and operator for a full day is $850 to $1,200, and a digger working with a truck is $1,700 to $2,400. More detail is in the hourly rate guide.
Rates per cubic metre
| Work | Guide price per m³ |
|---|---|
| Dig and load, good access | $25 to $60 |
| Cut, move and compact as fill on the same site | $20 to $45 |
| Cart away and tip clean fill | $45 to $110 |
| Dig and remove on a tight-access site | $120 to $300 |
| Imported hardfill, placed and compacted | $90 to $160 |
Volumes are measured in the ground, before digging. That matters because soil bulks up once it is loosened. Auckland clay swells by 20 to 40 percent, so 100 cubic metres in the ground fills trucks as 120 to 140. A 6-wheel truck carries 6 to 8 loose cubic metres, which makes that 100 cubic metre dig roughly 17 to 23 loads.
Typical job prices
| Job | Guide price |
|---|---|
| Site scrape for a new house | $2,500 to $7,000 |
| Driveway digout and compacted base | $45 to $95 per m² |
| Building platform, near-level section | $8,000 to $30,000 |
| Cut-and-fill platform, sloping section | $25,000 to $80,000 |
| Pool excavation | $6,000 to $20,000 |
| Clearing a typical house section | $3,000 to $12,000 |
| Trench, dug and backfilled | $25 to $70 per metre |
Three worked examples
A 60 m² driveway digout
At $45 to $95 per square metre, the digout and compacted metal base for a 60 square metre driveway comes to $2,700 to $5,700. If an old concrete driveway has to be broken out first, add $2,400 to $5,400. See the driveway digout depth guide for what is under those figures.
A 100 m³ dig with everything carted away
Digging and loading 100 cubic metres at $25 to $60 is $2,500 to $6,000. Carting and tipping it at $45 to $110 is $4,500 to $11,000. Together that is $7,000 to $17,000. Notice that the cartage is the bigger half.
The same 100 m³ kept on site
If the design lets that soil be placed as compacted fill on the low side of the section, the rate is $20 to $45, or $2,000 to $4,500 in total. That is why balancing cut and fill is the first thing a good designer tries to do.
What moves the price
- Access. If a truck can stand beside the digger, spoil is handled once. Through a one metre side path it is handled three times, with small gear. See tight access excavation.
- Cartage distance and tip fees. Truck time to the tip and back, plus the fee per load. Rural sites in Rodney and Franklin can be a long way from either.
- Ground. Basalt on the isthmus needs a breaker at $180 to $280 an hour. Peat and wet clay are slow and heavy.
- What the soil is. Clean soil is cheap to tip. Soil with rubbish, asbestos or contamination goes to a licensed facility at $180 to $400 per tonne.
- Season. Clay work is quicker and cleaner from October to April.
- Slope. Steeper sites need more cut, more wall and more care.
Costs outside the digging
| Item | Guide cost |
|---|---|
| Erosion and sediment controls, house site | $800 to $3,000 |
| Geotechnical report | $2,500 to $5,000 |
| Engineer's design for walls or cuts | $1,500 to $4,000 |
| Compaction testing | $400 to $1,200 per visit |
| Resource consent for earthworks, where needed | $4,000 to $12,000 |
Not every job needs these. A driveway digout needs none of them beyond a silt fence. A platform on a sloping section may need all five. The consent guide explains when a consent applies.
Reading a quote
A sound earthworks quote states the volume it is based on, where the spoil is going, the tip fees, the imported metal by type and quantity, and the hourly rates that apply if rock or soft ground is found. Be wary of a single lump sum with none of that, and of a price that is far below the others: the difference is usually cartage that has been left out or an assumption that the soil can stay on site when it cannot. Ask what is excluded. Reinstating lawns, repairing the berm, traffic management and consent fees are common omissions.
Ways to keep the cost down
- Keep soil on site where the levels allow it.
- Improve access, even temporarily, by removing a fence panel or a gate.
- Do all the machine work in one visit: scrape, digout, trenches and driveway base.
- Book the work for the dry months.
- Have service plans and any drawings ready, so the quote is not padded for unknowns.
Common questions
How much does earthworks cost per m³ in Auckland?
As a guide, $25 to $60 per cubic metre to dig and load with good access, and $45 to $110 more to cart away and tip. Where soil can be reused on site as compacted fill, the all-in rate is $20 to $45.
How much does a day of digger and truck hire cost?
A digger and tip truck working together is $1,700 to $2,400 a day as a guide, plus tip fees and transport of the machine.
Why are earthworks quotes so different from each other?
They are usually pricing different assumptions: how much spoil leaves the site, which tip it goes to, and whether rock, soft ground and sediment controls are included. Compare the assumptions before the totals.
Are prices plus GST?
Contractors normally quote earthworks excluding GST. The guide ranges on this site exclude GST. Check each quote.