Basement Dig Out Contractors in Auckland

Basements for new houses and garages cut into sloping sections, with the shoring, the spoil removal and the drainage planned before the first bucket.

  • Basement cuts for new builds and garages
  • Engineer-designed batters, benching or shoring
  • Spoil carted out and subsoil drainage installed

Get a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

On a sloping Auckland section, a basement is often the cheapest floor area you can add: a garage and a rumpus room tucked under the house where the ground falls away. Getting there means a deep cut, a lot of spoil and a retaining structure that becomes part of the building.

A basement digout is engineered work. The engineer sets how steep the cut can stand, what has to be shored, and how close the dig can go to the boundary and the neighbours' foundations.

Excavator cutting into a clay bank
Illustrative photo

New-build basements

For a new house the basement is cut as part of the bulk earthworks. The digger takes the ground down in stages, the cut face is battered back or supported with drilled piles, and the basement walls are built against it. A typical double-garage basement is 150 to 300 cubic metres in the ground, which is 30 to 50 truckloads once it bulks up, so truck access and a nearby tip matter. The cut is not left open over winter if it can be avoided.

Digging out under an existing house

Adding a basement under a house that is already there is a different job: the house is propped, and the soil comes out with a very small digger and conveyors or barrows. That work is covered on the under-house excavation page. Expect $300 to $700 per cubic metre for the digging alone, because of the access.

Water, the thing that ruins basements

A basement is a hole in clay, and clay holds water. Every basement wall needs a drain at its base, free-draining backfill, and a waterproof membrane where the room behind is habitable. The drain has to fall to a lawful outlet, which on a deep basement can mean a sump and pump. Groundwater is common near the coast, on the isthmus near old lava flows and at the bottom of gullies, and it changes both the design and the price. The subsoil drainage guide covers the detail.

Basements need a building consent, and the volume of earth involved often means a resource consent as well. See earthworks consent in Auckland.

Basement digout prices in Auckland

ItemGuide price
Basement or under-house digout, typical job$25,000 to $90,000
Dig and load, good access$25 to $60 per m³
Cart away and tip clean fill$45 to $110 per m³
Under-house digging, tight access$300 to $700 per m³
Engineer's design$1,500 to $4,000
Geotechnical report$2,500 to $5,000

Guide prices for the excavation only. Basement walls, waterproofing, drainage and the slab are separate.

Questions about basement digouts

How much does a basement dig out cost in Auckland?

As a guide, $25,000 to $90,000 for the excavation on a typical job, depending on volume, access and how the cut has to be supported. On an open new-build site the digging and cartage are $25 to $60 and $45 to $110 per cubic metre.

Does a basement need a consent?

Yes. The basement is part of the building and needs a building consent with an engineer's design. The earthworks may also need a resource consent, depending on volume and the overlays on the site. Confirm with Auckland Council.

How close to the boundary can the dig go?

That is the engineer's call. A deep cut near a boundary can undermine the neighbour's land or building, so it is usually supported with piles or shoring installed before the dig.

What happens if rock is found?

On the volcanic parts of Auckland it is common. Basalt is broken out with a hydraulic breaker on the digger, which is slower and noisier, and is priced as an hourly allowance.

Who actually does the work?

An independent Auckland earthworks contractor that we partner with. They come to the site, price the job in writing and carry it out under their own name.

How it works

From enquiry to finished job.

  1. Tell us about the job

    Send the form or call. What needs digging, a rough size and a suburb is enough to start.

  2. Site visit

    The contractor checks access, slope, the ground, underground services and where the spoil can go.

  3. Written, itemised quote

    Machine time, cartage, tip fees, imported metal and any consent costs listed separately, with a start date. No obligation.

  4. Dig, cart and tidy up

    Sediment controls go in first. The site is left trimmed, compacted and clean, and you walk it before the last invoice.

Get a price on basement digouts

Send the form and we will line up a free site visit. You then get a written quote with every cost listed. Or ring and talk it through.

Call 09 886 7219

Request a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Call nowFree quote