Auckland Earthworks Company

Earthworks in Auckland, from a mini digger down a side path to a full cut and fill: excavation, digouts, site clearing and building platforms. A site visit, then a written quote that shows machine time, cartage and tip fees.

  • Site scrapes, cut and fill, digouts and trenching
  • Diggers from 1 tonne to 20 tonne, with trucks
  • Sediment control and consent needs sorted up front

Free Auckland earthworks quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Digger levelling a building site
Pipe laid in a trench
Metalled driveway base
Mini digger on a tight residential site
Built for Auckland ground

Earthworks in Auckland: clay, basalt, steep sections and a lot of rain.

Auckland is two kinds of ground. Most of the region is clay over soft sandstone: easy to dig, heavy to cart, and slurry after a wet week. The central isthmus and parts of the south and the Shore sit on basalt lava, where a bucket can hit rock less than a metre down. Add steep sections, rear lots and narrow side paths, and the same job can cost twice as much on one street as on the next.

That is why every job starts with a site visit. The contractor checks access, slope, ground, underground services and where the spoil can go, and you get a written quote with machine time, cartage, tip fees and imported material listed separately.

How it works →
Excavator digging a clay bank
Prices

What earthworks cost in Auckland.

Earthworks are priced by the hour, by the cubic metre or by the job. These are realistic Auckland ranges, before GST.

ItemGuide price
Mini digger (1.7 t) with operator$95 to $130 per hour
3 to 5 tonne digger with operator$110 to $150 per hour
8 to 14 tonne digger with operator$140 to $190 per hour
Tip truck with driver$110 to $150 per hour
Dig and load, good access$25 to $60 per m³
Cart away and tip clean fill$45 to $110 per m³
Cut and fill on the same site$20 to $45 per m³
Driveway digout and compacted base$45 to $95 per m²
Site scrape for a new house$2,500 to $7,000
Trench, dug and backfilled$25 to $70 per metre

Guide prices. Soil swells 20 to 40 percent once dug, so a cubic metre in the ground is more than a cubic metre on the truck.

Full earthworks price guide →

How it works

From first call to finished site.

  1. Tell us about the job

    Send the form or call. What needs digging, a rough size and a suburb is enough to start.

  2. Site visit

    The contractor checks access, slope, the ground, underground services and where the spoil can go.

  3. Written, itemised quote

    Machine time, cartage, tip fees, imported metal and any consent costs listed separately, with a start date. No obligation.

  4. Dig, cart and tidy up

    Sediment controls go in first. The site is left trimmed, compacted and clean, and you walk it before the last invoice.

Before you compare quotes

Where earthworks quotes differ.

Two quotes for the same dig can be thousands apart. The gap is nearly always in these four things, so ask for each in writing.

01

Cartage and tip fees

How many truckloads, to which tip, at what fee. Often more than the digging itself.

02

Rock and soft ground

The hourly rate for rock breaking and the rate for digging out and replacing soft spots.

03

Compaction

Fill placed in layers, rolled and tested. Tipped fill settles under slabs and driveways.

04

Sediment control

Silt fences, a stabilised entrance and road cleaning. Required on every Auckland site.

Consents

Do your earthworks need a consent?

Under the Auckland Unitary Plan it depends on the volume of soil moved, the area disturbed, the slope, the zone and the overlays on the property. A small digout on a plain residential section is often permitted. The same digout in a flood plain, across an overland flow path, near protected trees or in a coastal or heritage overlay may not be.

Retaining walls over 1.5 metres, or carrying a driveway or building, need a building consent and an engineer. Work near public pipes needs approval. Check your property on Auckland Council GeoMaps and confirm with the council before work starts.

Earthworks consent in Auckland →

Sediment

Erosion and sediment control.

Bare Auckland clay sheds silt in the first heavy shower, and it ends up in the stormwater drain and then the harbour. Every site has to keep its soil and dirty water on site, consent or no consent, following the council's GD05 guideline.

In practice that means a stabilised entrance, silt fences on the low side, clean water diverted around the work, stockpiles covered and finished ground stabilised quickly. It is set up before the first cut.

Erosion and sediment control explained →

Where we work

Earthworks contractors near you.

All of Auckland, from Warkworth to Pukekohe. The ground, the slopes and the planning overlays change from one suburb to the next, so each area has its own page.

All areas →

Regions

Suburbs and towns

Questions

Earthworks questions.

How much do earthworks cost in Auckland?

As a guide, a 3 to 5 tonne digger with an operator runs $110 to $150 an hour and a tip truck with a driver $110 to $150. Measured by volume, digging and loading costs $25 to $60 per cubic metre and carting the spoil away and tipping it adds $45 to $110. A site scrape for a new house is usually $2,500 to $7,000. Access, cartage distance and what the ground turns out to be move the price more than anything else.

Do I need a resource consent for earthworks in Auckland?

Sometimes. Under the Auckland Unitary Plan it depends on how much soil is moved, the area disturbed, the slope, the zone and any overlays on the property, such as a flood plain, an overland flow path, protected trees or a coastal or heritage overlay. Small jobs on a plain residential section are often permitted. Check your property on Auckland Council GeoMaps and confirm with the council before work starts.

What do earthworks include?

Any job that changes the shape of the ground: clearing and scraping a section, cutting and filling for a building platform, digging out driveways, basements, pools and foundations, trenching for drains and services, and building up ground with compacted hardfill. Retaining walls, drainage and demolition usually sit alongside it.

How long do earthworks take?

A driveway digout or a site scrape is usually one to three days. A cut-and-fill building platform on a sloping section is one to three weeks. Rain stops clay work, so winter jobs take longer than the same job in summer.

Where does the soil go?

Clean soil is reused on site where the design allows, because cartage and tip fees are a large part of most quotes. The rest goes by truck to a clean fill site. Soil that is contaminated, or has asbestos or rubbish in it, has to go to a facility licensed to take it, and that costs far more.

What is erosion and sediment control?

Measures that stop soil and dirty water leaving the site: a stabilised entrance, silt fences, diverting clean water around the work and covering stockpiles. It is required on every Auckland site, with or without a consent, and the council can fine owners and contractors when sediment reaches the road or a drain.

Who does the work?

Auckland Earthworks Company takes your enquiry and arranges the site visit. The work is carried out by an independent Auckland earthworks contractor we partner with, who prices the job and does it under their own name.

Which areas do you cover?

All of Auckland: the central suburbs, the North Shore, West Auckland, East Auckland, South Auckland, the Hibiscus Coast, Rodney up to Warkworth and Franklin down to Pukekohe.

Can a digger get into my section?

Usually. A 1.7 tonne mini digger needs a gap of about a metre, and smaller machines fit through a standard gate. Tight access means smaller buckets and more handling of the spoil, so the job takes longer and costs more per cubic metre.

What happens at the site visit?

The contractor looks at access, slope, the ground, where underground services run and where the spoil can go. You then get a written quote that lists machine time, cartage, tip fees, imported material and any consent or engineering costs separately.

Ready to price your earthworks?

Send the form and we will line up a free site visit. You then get a written quote with every cost listed. Or ring and talk it through.

Call 09 886 7219

Request a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Call nowFree quote