In short
- Keystone-style walls are dry-stacked interlocking concrete blocks with no mortar.
- Low walls hold by weight. Taller ones are tied back with layers of geogrid.
- The compacted base and free-draining backfill matter more than the blocks.
- Built cost is $500 to $850 per m² as a guide.
Keystone is the name most New Zealanders use for a segmental concrete block retaining wall: purpose-made blocks stacked dry, without mortar, each course locked to the one below by pins, lugs or a lip. The wall leans back slightly into the bank and holds the soil by its own weight, or, for taller walls, by layers of reinforcing mesh that tie it into the ground behind. Several manufacturers make block systems of this kind.
How a segmental wall holds soil
Gravity walls
Up to roughly a metre, depending on the block and the soil, the mass of the blocks and the backward lean, called the batter, are enough to resist the soil. Each block is set back a little from the one beneath, so the face slopes at a few degrees.
Reinforced soil walls
Above that height, sheets of geogrid, a strong plastic mesh, are laid between block courses and run back horizontally into the compacted fill, typically for a distance of 60 to 100 percent of the wall height. The grid and the fill act together as one large block of reinforced soil, with the blocks as its face. Built this way, segmental walls can go several metres high. The catch is the space needed behind the wall for the grid, which makes them less suited to cuts tight against a boundary.
What goes into the wall
| Element | Detail |
|---|---|
| Base | A trench filled with 150 mm or more of compacted, well-graded aggregate, dead level along its length |
| First course | Partly buried, typically by one block or about 10 percent of the wall height |
| Blocks | Hollow or solid concrete units, split-face or smooth, with a locking system |
| Drainage zone | At least 300 mm of clean drainage aggregate directly behind the blocks, and in the block cores where hollow |
| Drain | Perforated pipe at the base of the drainage zone, falling to an outlet |
| Geogrid | On taller walls, at the levels and lengths in the design |
| Backfill | Suitable soil or hardfill compacted in layers of 150 to 200 mm |
| Capping | Cap units glued to the top course |
Building sequence
- Excavate the bank and the base trench. For a reinforced wall, the cut extends back the full length of the geogrid. This is the earthworks part of the job: see excavation.
- Prepare the base. Aggregate is placed, compacted and levelled precisely. Any error here shows in every course above.
- Lay the first course, checking level front to back and side to side on each block.
- Stack, fill and compact. After each course or two, drainage aggregate goes behind the blocks, backfill behind that, and both are compacted before going higher.
- Place geogrid at the specified courses, pulled taut and covered with fill before any machine runs over it.
- Cap the wall and shape the ground above so surface water runs away from it.
Where segmental block suits
- Curves and corners. Tapered blocks form smooth curves that are awkward in timber or sleepers.
- Garden terraces and planters, where the finished face is on show.
- Driveway and entrance walls.
- Fill situations, such as building up a platform, where the space for geogrid already exists.
- Sites where concrete trucks and drilling rigs cannot reach, since blocks and aggregate can be moved by small machines.
Where another wall is better
- Tight boundary cuts over about a metre, where there is no room for geogrid. A timber pole or concrete sleeper wall, which gets its strength from embedded posts, fits in a narrower strip.
- Soft or wet foundations. A segmental wall needs a firm base. Gabions tolerate more movement.
- Tight budgets. Timber is cheaper.
Common faults
- Base not level or not compacted. The wall dips and gaps open between blocks.
- Clay backfill against the blocks. Water builds up, and the wall bulges.
- Geogrid left out, cut short or laid slack on a wall that needed it.
- Backfill dumped in one go and never compacted, so the ground behind settles and drags the grid down.
- Extra load added later: a driveway, a pool or another wall above that was not in the design.
Consent and engineering
The same rule applies as for any retaining wall in New Zealand. No building consent is needed where the wall retains no more than 1.5 metres of ground and supports no surcharge. Above that, or with a driveway, building or slope on top, the wall needs a consent and specific design. Block suppliers publish design tables for their systems, and an engineer adapts them to the site's soil and loads. Tiered walls close together count as one tall wall for design purposes. Confirm requirements with your council.
Cost
| Item | Guide price |
|---|---|
| Keystone-style block wall, built | $500 to $850 per m² |
| Timber wall up to 1.5 m, for comparison | $350 to $600 per m² |
| Concrete sleeper or masonry block, for comparison | $550 to $950 per m² |
| Engineer's design, where needed | $1,500 to $4,000 |
Guide prices per square metre of wall face, built and drained, before GST, on a site with reasonable access.
A curved garden wall 14 metres long and 1 metre high is 14 square metres, or $7,000 to $11,900 at $500 to $850 per square metre. Taller reinforced walls cost more per square metre because of the extra excavation, geogrid and imported fill. Compare wall types in the retaining wall cost guide and the timber wall guide, or see the retaining walls page for Auckland work.
Lifespan
Concrete blocks do not rot or rust, and the geogrid is buried away from sunlight, so a correctly built wall should last 50 years or more. Maintenance is light: keep the drain outlet clear, do not let trees establish in the face, and re-glue any loose caps.
Common questions
What is a Keystone retaining wall?
A wall of interlocking concrete blocks stacked without mortar on a compacted base. Low walls hold by weight, and taller ones are tied into the backfill with geogrid.
How high can a Keystone wall be?
Around a metre as a gravity wall, depending on block and soil. With geogrid reinforcement and an engineer's design, several metres. Over 1.5 metres of retained height needs a building consent.
Does a segmental block wall sit on concrete?
Usually not. They sit on a levelled base of compacted aggregate. Some designs on poor ground specify a concrete levelling pad.
How much does a Keystone wall cost in NZ?
As a guide, $500 to $850 per square metre of wall face, built and drained.