In short
- Relevelling a piled house in Auckland is $8,000 to $30,000 as a guide.
- A full repile is $20,000 to $45,000. A single pile replaced is $350 to $800.
- Fix the cause, usually water or rotten piles, or the floors will move again.
- A few like-for-like piles are generally exempt from consent. A substantial repile generally is not.
Relevelling a typical timber-floored house on piles in Auckland costs $8,000 to $30,000 as a guide, depending on how far it has dropped, how many piles need replacing and how easy it is to work underneath. A complete repile is $20,000 to $45,000. Houses on concrete slabs are relevelled by different, specialist methods and are priced case by case.
Guide prices
| Work | Guide price |
|---|---|
| Relevel a piled house (jack and pack, some new piles) | $8,000 to $30,000 |
| Full repile | $20,000 to $45,000 |
| Single pile replaced | $350 to $800 each |
| Subsoil drain to protect foundations | $90 to $200 per metre |
| Engineer's assessment or design | $1,500 to $4,000 |
| Building consent fees, where required | $2,500 to $6,000 |
Guide prices for Auckland before GST, on a site with reasonable access. Only the written quote that follows a site visit is a firm figure.
For a house needing 20 piles replaced, at $350 to $800 each that part alone is $7,000 to $16,000, before jacking, packing and making good.
Signs a house is out of level
- Floors that slope, bounce or feel soft in places.
- Doors and windows that stick, swing open on their own or show uneven gaps.
- Cracks in plasterboard above door frames, or in brick veneer.
- Gaps opening between skirting boards and floor, or between walls and ceiling.
- Outside, cladding lines or the roof ridge visibly dipping.
A marble on the floor or a long spirit level gives a first indication. A relevelling contractor maps the whole floor with a laser or water level.
Why Auckland houses sink
- Reactive clay. Much of Auckland's clay shrinks as it dries in summer and swells in winter. Shallow piles move with it, and over decades they do not all return to the same place.
- Old piles. Villas and bungalows were often built on native timber or early concrete piles. Timber rots at ground level. Old concrete piles tilt and crumble, and some are barely in the ground.
- Water. Leaking pipes, disconnected downpipes and ground that slopes toward the house keep the subfloor soil wet and soft.
- Trees. Large trees close to the house draw water from clay and shrink it on one side.
- Fill. Houses partly on uncompacted fill settle on the fill side.
- Slope movement. Slow creep on hillsides, or damage from a slip.
How piled houses are relevelled
Jack and pack
Where the piles are sound but have settled, the bearers are lifted with hydraulic jacks, a few millimetres at a time across the house, and packers are fixed between pile and bearer at the new height. It is the quickest and cheapest method.
Replacing piles
Rotten, cracked or undersized piles are removed and new treated timber or concrete piles are set in concrete footings dug to firm ground. This is done a few at a time while the house is supported on jacks and temporary props. If most of the piles are poor, a full repile makes more sense than patching.
Access under the house
Working room decides much of the price. With a metre of clearance, piles are replaced from below. With 300 mm, floorboards are lifted from inside or soil is dug out to make room. That digging, and any lowering of the subfloor ground, is small-scale under-house excavation.
Houses on concrete slabs
A slab that has sunk is lifted by specialists, either by injecting expanding resin or grout beneath it or by underpinning the edges with new piles and jacking from those. Both need an engineer to say why the slab moved and whether the method suits the ground. Costs vary too much to give a general range.
Fix the cause as well as the level
Packing a house level without dealing with what moved it is a short-term fix. Alongside the relevel:
- Repair leaking supply and waste pipes under the floor.
- Connect all downpipes to the stormwater system.
- Reshape the ground so it falls away from the house, and lower soil or paving that has built up against it.
- Install a subsoil drain along the uphill side where groundwater or seepage reaches the subfloor.
- Clear subfloor vents and consider a ground vapour barrier.
- Get advice on large trees close to the foundations.
The earthworks side of this, regrading and drainage, is covered on the site drainage page and in the clay drainage guide.
What happens to the rest of the house
Lifting a floor that has been out of level for decades moves everything attached to it. Expect some cracked plaster, doors that need re-hanging, and possibly leaks at old plumbing joints. Brick veneer and tiled showers are the least forgiving. A careful contractor lifts slowly and may stop short of perfectly level where going further would do more harm than good. Allow a budget for redecorating.
Consent
Under Schedule 1 of the Building Act, repair and replacement with comparable materials in the same position is generally exempt from building consent, which covers replacing a limited number of piles like for like. Complete or substantial replacement of the foundations, new or deeper foundations, lifting a house to a new height, and work on slab foundations generally do need a consent, with an engineer's or designer's input. Houses in special character and heritage overlays may have further rules. Councils interpret the boundary between repair and substantial replacement, so confirm with Auckland Council before work starts.
How long it takes
A jack-and-pack relevel is a few days. A relevel with twenty or thirty new piles is one to two weeks. A full repile of a villa is two to four weeks. The house can usually be lived in throughout, with some noise and the occasional jolt.
Insurance and natural hazards
Gradual settlement is generally treated as maintenance and is not insured. Damage from a specific event, such as a landslip, flood or earthquake, may be covered by your house insurance and the natural hazards scheme. Speak to your insurer before starting repairs. Related costs are in the guide to subfloor and foundation repair.
Common questions
How much does it cost to relevel a house in Auckland?
As a guide, $8,000 to $30,000 for a piled house, depending on how many piles need replacing and the access underneath. A full repile is $20,000 to $45,000.
Do I need a building consent to repile my house?
Replacing a few piles like for like is generally exempt. A full or substantial repile, or new foundation design, generally needs a consent. Confirm with Auckland Council.
Can I stay in the house while it is relevelled?
Usually yes. The work is done from underneath or through small openings in the floor, and lifting is gradual.
Will relevelling crack my walls?
Some cracking of plaster is common when a floor is lifted back after years out of level. A slow, staged lift keeps it to a minimum.