In short
- Living on site saves rent, but it needs the council's rules, your builder and your insurer on side.
- You need a toilet, water, power and safe access that stay clear of the building work.
- A level, metalled pad and a separate entrance make the biggest difference.
- Building the garage or a minor dwelling first is often the most comfortable route.
Plenty of New Zealanders live on their section while their house is built, in a caravan, a hired cabin, a tiny home, a shed fitted out for the purpose or a sleepout that will later become part of the property. It can save a year or more of rent. It also has rules, costs and risks that are better dealt with before the digger arrives than after you have moved in.
Is it allowed?
There is no single national answer. Three sets of rules can apply.
- The district plan. Many councils allow temporary accommodation on a site during construction, for a limited period and with conditions. Others treat a second dwelling, even a temporary one, as needing resource consent. In Auckland, check with Auckland Council for your zone.
- The Building Act. A vehicle that is immovable and occupied on a long-term basis can be treated as a building, which brings in building consent requirements. Cabins and sleepouts with plumbing need consent for that plumbing. Small detached buildings without sanitary facilities may be exempt, within limits.
- Wastewater and health rules. You must have a lawful way to deal with toilet and grey water.
Also read your land covenants. Many subdivisions prohibit caravans and temporary buildings, or limit how long they can stay.
Talk to your builder and insurer first
A building site is a workplace under the Health and Safety at Work Act, and the main contractor is responsible for managing it. Having a family living inside the fence changes their risks, so they need to agree to it, and the contract should say where you may and may not go. Your insurer needs to know too: contract works insurance covers the build, not your caravan and its contents, and a claim can be complicated if the insurer was not told the site was occupied. The lender, if there is one, may also have a view.
Accommodation options
| Option | Good for | Watch out for |
|---|---|---|
| Caravan or motorhome | Short builds, couples, flexibility | Cold and damp in winter, limited space |
| Hired portable cabin | Longer builds, families | Delivery access, hire cost, usually no plumbing |
| Tiny home on wheels | Those who own or will keep one | May be treated as a building |
| Garage or shed built first | A dry, secure base that stays | Using it as a dwelling may breach its consent |
| Minor dwelling built first | The most comfortable route | Needs its own consent and adds time up front |
| Existing house during a rebuild or renovation | Staged projects | Dust, noise, services off at times |
Building a consented minor dwelling or sleepout first, living in it during the main build and keeping it afterwards for family, guests or rent is popular for good reason. It costs more at the start and returns the most.
What the site needs
A place to put it
The living area should be out of the way of everything the build needs: the building platform, material deliveries, the concrete pump, scaffolding, the crane or hiab, and trenches for services. A corner near the road frontage with its own gate is ideal. The pad needs to be level, firm and drained, because a caravan on wet clay sinks and the path to it becomes a bog. A scraped and metalled pad is a small job when the earthworks contractor is already on site for the site scrape.
Access
You need a way in and out that does not cross the work area, usable at night and in the rain. A metalled track or an early first layer on the future driveway does the job and keeps mud off the road, which is also a sediment control requirement. Parking should be clear of where trucks turn.
Toilet and wastewater
The options are a serviced portable toilet, a caravan cassette emptied at a dump station, a composting toilet, or an early connection to the sewer or to the new septic system. Greywater cannot simply run onto the ground or into a stormwater drain. If the site will have an on-site wastewater system, installing it early serves both the temporary and the final house, but its disposal field must then be fenced off from machinery.
Water
On town supply, the builder's temporary connection can serve you too. On rural sites, the permanent water tank can be installed first on its pad and filled by tanker or from a shed roof.
Power
A temporary builder's supply can have a caravan outlet added by an electrician. Running extension leads from a neighbour or a generator all winter is neither safe nor pleasant. If the permanent cable trench can be dug early, do it: see trenching.
Safety, especially with children
- Fence the living area off from the work area, with a gate that latches.
- Open excavations, footing trenches and pile holes are the main hazard early on. They should be fenced or covered at the end of each day.
- Keep clear of machinery. Operators cannot see behind them.
- Agree on site hours, and stay out of the work area outside them unless invited.
- Later, scaffolding and unfinished stairs and floors are the risk. Children should never be on the build unsupervised.
- Dogs need to be contained.
What it costs, roughly
The accommodation is the main cost and varies widely. The site works to support it are modest when done with the rest of the earthworks: a metalled pad and track is typically a few hours of a small digger at $110 to $150 an hour plus hardfill at $90 to $160 per cubic metre, and service trenches are $25 to $70 per metre. Against that, a year's rent in Auckland is tens of thousands of dollars.
A sensible order of work
- Check council rules, covenants, the builder's position and insurance.
- Decide the location of the living area on the site plan.
- Have the earthworks contractor form the entrance, pad and track with the site scrape.
- Bring in water, power and the toilet arrangement.
- Fence the living area.
- Move in once the bulk earthworks are finished, not before.
The earthworks side of setting up a site is covered on the residential earthworks page and under site clearing.
Common questions
Can I live in a caravan on my section while I build in NZ?
Often, but it depends on your council's district plan, any covenants on the land and the builder's agreement. Some councils allow it for a set period during construction. Check before you move on.
Do I need consent for a cabin or sleepout to live in during the build?
It depends on its size, whether it has plumbing and how the council treats it. Small detached buildings without sanitary facilities may be exempt from building consent. Ask the council.
What services do I need to live on site?
A lawful toilet and greywater arrangement, drinking water, a safe power supply, and all-weather access that is separate from the work area.
Is it safe to live on a building site with children?
It can be, if the living area is fenced off from the work, excavations are covered or fenced each day and children never enter the build area unsupervised.